OJEU Contracts
More Tenders »Construction, foundation and surface works for highways, roads
Published 28/12/2020
Hackney and Newham
Country UK
Status Contract notice
CType Works
Reference | 2020/S 252-638044 |
Award Criteria | The most economic tender |
Procurement | Restricted procedure |
Main Activities | General public services |
Common Procurement Vocabulary | Construction foundation and surface works for highways roads |
Date Published | 28th Dec 2020 |
Hackney and Newham
Country UK
Status Contract notice
CType Works
Contract notice
Works
Section I: Contracting authority
Postal address: Newham Dockside, 1000 Dockside Road
Town: London
NUTS code: UKI41 Hackney and Newham
Postal code: E16 2QU
Country: United Kingdom
E-mail: Paul.Gannon@newham.gov.uk
Internet address(es):
Main address: www.newham.gov.uk
Section II: Object
LB Newham — Highways Schemes and Planned Works 2020
A framework contract to provide a range of highway planned scheme implementation and planned maintenance activities. Including improvements and modifications to existing carriageway and footways, resurfacing, installation of highway infrastructure, soft landscaping and electrical street lighting equipment.
The framework will be able to be accessed by the London Borough of Havering for its own schemes.
Highways Schemes and Planned Maintenance Framework 2021 — below GBP 150 000
Works generally within the boundaries of the contracting authority being the London Borough of Newham. This framework may also be utilised by the London Borough of Havering.
The implementation of new highways schemes, planned repair and planned maintenance of existing highways and other public areas: re-surfacing and reconstruction of highways
Including laying of specialist surfaces; maintenance, repair and replacement of street furniture, including non-illuminated signs, railings etc.; laying of road markings; highway drainage.
The framework (NEC4) will be split into two lots. Each lot will have two contractors assigned.
Lot 1: Works up to GBP 150 000 (approx.), small schemes and maintenance, mostly resurfacing and renewal on residential streets.
At the end of the framework period.
Highways Schemes and Planned Maintenance Framework 2021 — above GBP 150 000
Works generally within the boundaries of the contracting authority being the London Borough of Newham. This framework may also be utilised by the London Borough of Havering.
The implementation of new highways schemes, planned repair and planned maintenance of existing highways and other public areas: re-surfacing and reconstruction of highways
Including laying of specialist surfaces; maintenance, repair and replacement of street furniture, including non-illuminated signs, railings etc.; laying of road markings; highway drainage.
The framework (NEC4) will be split into two lots. Each lot will have two contractors assigned.
Lot 2: Works above GBP 150 000 (approx.) in value, more complicated than work included in Lot 1.
Works packages will be under NEC ECC 4 Option B - re-measurable.
At the end of the framework term.
Section IV: Procedure
Section VI: Complementary information
Postal address: Strand, Holborn
Town: London
Postal code: WC2A 2LL
Country: United Kingdom
In accordance with Regulation 86 and 87 of the Public Contracts Regulations 2015, the contracting authority has incorporated a minimum 10 calendar day standstill period starting from the day that bidders are notified of the contract award. Unsuccessful bidders will be provided with a de-brief of the award decision at the start of the standstill period including details of their bid in relation to the winning bid(s) comprising:
— the reasons for the decision;
— the characteristics and relative advantages of the successful tender(s);
— the score and name of the economic operator(s) to be awarded the contract.
Bidders have the right to appeal as provided for within the Public Contract Regulations 2015. Any such proceedings must be brought before the High Court of England and Wales.
Reference | 2020/S 252-638044 |
Award Criteria | The most economic tender |
Procurement | Restricted procedure |
Main Activities | General public services |
Common Procurement Vocabulary | Construction foundation and surface works for highways roads |
Date Published | 28th Dec 2020 |