Did you know that there is a version of The Construction Index for the USA? Visit the site No thanks
Follow us on Twitter Follow us on LinkedIn Follow us on Instagram
Daily construction news
Weekly plant news

Construction News

Tue June 27 2017

Related Information
Related Information
Related Information

News » UK » Excavation collapse at top girls’ school » published 10 May 2013

Excavation collapse at top girls’ school

A Kent construction company has been fined for unsafe excavation work after a worker was seriously injured at a school near Cranbrook.

Benenden School Above: Benenden School

The BBS Construction employee, who does not wish to be named, smashed his right hip on 18 January 2011 when the face of a 4m-deep excavation collapsed on top of him. He also injured his left knee after being buried up to his waist by earth and rubble, and was unable to work for several months.

The incident took place at Benenden, the famous school for girls, whose former pupils include Princess Anne, Lady Victoria Hervey and Rachel Weisz.

Maidstone Magistrates’ Court heard this week that the collapse occurred during work to build a new multi-storey science block (pictured below), which Tovil-based BBS Construction was contracted to deliver.

The injured worker, then aged 44, was excavating a basement to support the new building. However, concrete to fix the posts for a supporting wall had been overpoured and the excess had to be chipped away with a manually-operated hydraulic breaker. It was this work that triggered the collapse.

A quick-thinking excavator driver managed to stem the flow of earth by placing the bucket of his machine into the face of the weakened earth, but his colleague was still caught and trapped. Another worker managed to jump clear.

The Health & Safety Executive (HSE) investigated the incident and established that the risks of manually breaking the excess concrete were not properly assessed.

An inspector also found that earlier in the project a waste water drain had been installed by BBS less than half-a-metre from the face of the basement excavation at a depth of two metres. Magistrates were told that this may have weakened the earth around the basement and made it more susceptible to collapse.

BBS Construction Ltd, of Church Street, Tovil, Maidstone, was fined £8,000 and ordered to pay £10,536 in costs after pleading guilty to a single breach of the Construction (Design and Management) Regulations 2007.

After the hearing HSE Inspector Kevin Golding said: "This prosecution demonstrates the need to properly plan all aspects of excavation activity, and to reassess systems and methods of work if a problem arises - as happened here when the concrete for the supporting posts was overpoured.

"The retaining wall system itself was sound, but the decision to manually chip away the excess was flawed.

"The injured worker was dangerously exposed, and could have been more seriously hurt, or possibly even killed, but for the instinctive action of his colleague in using the excavator to shield him.

"BBS Construction Ltd could and should have done more to prevent workers from needing to work so close to the unsupported vertical face of a four metre deep excavation."

 

 

 

MPU

Further Images

Download our free construction news iPhone / iPad app. Sign up to our FREE email newsletters or subscribe to our RSS feed for regular updates on the latest Construction News, Plant News, Contract News & Supplier News. The Construction Index also provides the latest Construction Tenders, Construction Market Data & Construction Law Commentary all FREE.

This article was published on 10 May 2013 (last updated on 10 May 2013).

More News Channels