Construction Index TV

Wed April 24 2024

Related Information

Aerial lifts for Maentwrog bridge installation

A new maintenance footbridge for Maentwrog hydro-electric plant in north Wales has been installed 110 metres above the Dwyryd estuary, using a series of helicopter lifts.

Video uploaded on 27/08/2021 12:00am. Click here to read more about this video

Embed this video on your site:
Previous Page