Construction Index TV

Thu April 25 2024

Related Information

Bridge installation at Tilbury2

A 360-tonne steel bridge is lifted into place as part of the construction of a new port for the southeast, Tilbury2.
The bridge was towed 135 miles from Rotterdam before it was lifted into place. The bridge is the first of three components to be installed to create a Ro-Ro facility for the new terminal. Main contractor is Graham.

Video uploaded on 29/11/2019 12:00am.

Embed this video on your site:
Previous Page