Launching the deck of the New Wear Crossing
A 20-hour jacking operation between 26 and 28 March 2017 pushed the 4,750-tonne, 300-metre long deck of the New Wear Crossing into its final position over the River Wear in Sunderland.
Video uploaded on 30/03/2017 10:46am.
Previous Page